DOWNTIME & SCRAP REDUCTIONS and facility optimization
REVIEW YOUR CURRENT AUTOMATED OPERATIONS
Production Methods
Control System and Control Strategies
Sensors, Motors, other I/O devices
Alarms, Data Trending and Logging
Operator Interface and SCADA Functionalities
Panels, Junction Boxes, Raceways and Wiring
Root cause analysis of downtimes and scrap productions
Exploration of the Hot Switchover issues
IMPLEMENT THE OPTIMIZATION SOLUTION
Site Installations and/or modifications
Startup and testing
Trainings
Let Us inplement a PRACTICAL OPTIMIZATION SOLUTIONS AND PROJECT IMPLEMENTATION STRATEGy
- Application programs, annotations, improvements of existing automated machineries and processes.
- Recommend practical optimization criteria and solutions.
- Determine a hot switchover statagy if needed.
- Design required changes to control system hardware and I/O devices
- Estimates on project cost, delivery dates, and return of investment.
- Training requirements for involved end users